Heat Insulation Window

Heat Insulation Window

Why choose PVC Windows? Eco-friendly: Environmentally friendly and sustainable – protects nature. Fully welded joints: Fusion welded frames and sashes impede leaks. Dual compression seals: Enhanced tightness , against air / water / sound and thermal insulation. Glazing options: Able to be single...

Product Details

                       Heat Insulation Window

  • Place of Origin:

  • Shanghai, China (Mainland)

  • Brand Name:Honor window

  • pvc transom window

  • Packaging Details

  • Packing for pvc transom window: 
    Step 1.Protective tape protects frames from scratches; 
    Step 2.Keep windows or doors fixed on iron pallets; 
    Step 3.Tie up windows or doors on the iron pallets with plastic belts; 
    Step 4.PE films to keep away from sea water; 
    Step 5.Fill in the space between each two iron pallets by air bags; 
    Step 6.Tie up iron pallets in container with plastic belts. 
    Our packages will ensure the windows and doors arrive at project jobsite in good condition.

  • Delivery Time

  • Shipped in 38 days after payment

Q:What is your main product?

A:We can supply the window system (including profile, hardware, accessories, glass) as well as the finished products ready for installation.

Q:How can I know your price?

A:The price is based on buyer's specific requirement, so please provide below information to help us quote exact price to you. 1) Shop drawing / window schedule to show the window dimensions, quantity and type; 2) Frame color; 3) Type of glass and thickness (single or double or laminated or others) and color (clear, tinted, reflective, Low-E or others, with Argon or without).

Q:What is the standard size of your windows and doors?

A:Our product is CUSTOMER MADE. We always manufacture windows and doors according to buyer's dimensions.

Q:What is your delivery time?

A: 38 days after deposit and drawing confirmed

Q:What is your standard color for aluminum frames?

A:Powder coating (Frost black and Sliver grey)

Q:What is your payment terms?

A:Normally, 30% - 50% of total amount by T/T as deposit and balance before delivery. Irrevocable L/C at sight is also acceptable.


Hot Tags: heat insulation window, China, manufacturers, factory

Inquiry

Related Products